Risk Management - Selecting Potential Sub-Contractors

The risk management of a project at the top level isthere will be a minimum of three companies thought
complex enough, but when the infeed from outsideto be capable of fulfilling the technical requirement for
companies has to be considered as well, it becomeseach item, preferably more in the first instance. This
even more so.list is then reduced to a manageable number (the
Starting with the receipt of an invitation to tenderideal three) by reviewing the possible sub-contractors
from a potential customer, the steps to be taken toin terms of the following.
manage the risk associated with selecting suppliersCompanies who have supplied goods in the past:
are as follows.- Quality and reliability of items supplied
The project technical lead must review all the- Timeliness of delivery
technical documentation received from the customer.- Adequacy of documentation
Following the project team's decision that certain- Attitude, flexibility and co-operation of personnel
items need to be sub-contracted, the technical lead- Ease of contract negotiation
will write, or have a representative write, a technical- Pricing policy
requirements specification for each item to be- After sales service, including warranty
sub-contracted, which will form part of theCompanies who have not supplied goods in the past
sub-contractor invitation to tender.- Reputation in the market place
In addition, all other members of the project team- Quality assurance certification
will review the areas of their own particular discipline- Financial stability
(quality assurance, configuration management, etc.)This list is not exhaustive but contains the most
and write their own specifications for flowing downimportant areas to be considered. The most
to the sub-contractor invitation to tender.objective way of reviewing the above, is to weight
For each item to be sub-contracted, a procurementeach one in order of importance, devise a scoring
package will be compiled. This will contain whatevermechanism, create a grid to be completed by each
documents are deemed necessary depending on themember of the review team and calculate the
complexity of the item in question, but as a minimumnumbers. This method isn't foolproof but is as close
the aforementioned technical specification.as it possibly can be.
To start the risk management process, all documentsAt this stage, the project risk has already been
to be included in the procurement package will bereduced because the best few of the potential
peer reviewed. This involves at least one person ofsub-contractors have been chosen to compete for
the same discipline comparing the customerthe sub-contract.
requirements with those included in theAlternatively, the selection process has shown that
sub-contractor specification to ensure that nothingthere is only one supplier capable of fulfilling the
has been omitted.requirements. This requires quite different handling
A list of potential suppliers for each item of supply isand will be the subject of a future article.
then drawn up. Ideally, in terms of risk mitigation,